Wednesday, November 16, 2016

11/9-11/16

This week I was spent my time working on the gear housing for the steering system as well as the linkages that control the up steering arm. I am also working on cutting out the second prototype out of wood since I adjusted some of the dimension from the last prototype. The hope is that validate the dimensions we choose and the bogie will not bind on the track. I also had to completely redo the housing assembly half way through this blog and that is why I stopped writing it. I will get back to work and try to have a complete model done as soon as possible.

No comments:

Post a Comment